GH15 Ventures wins Pek Chuan Building tender with $80.68 mil bid

The site has 28,700 sq ft of land and is zoned commercial, with a plot ratio of 2.5 and an elevation restriction of 12 storeys. At the permissible gross flooring area of 71,750 sq ft, the rate works out to $1,124 psf per plot proportion (ppr), leaving out any kind of land enhancement fee and lease top-up premium. The site gets on a 99-year contract that started in 1978, leaving around 51 years.

GH15 Ventures has already won the collective sale tender for Pek Chuan Establishment at 116 Lavender Street with an $80.68 million quote.

River Opus condominium

The existing four-storey building has retail space on the initial 3 levels and workplaces on the fourth. It is about 50m from Bendemeer MRT Station on the Downtown Line and inside strolling distance of Lavender MRT Terminal on the East-West Line. Loi defines it as the longest standalone industrial building with a complete frontage along Lavender Street.

The arrangement was brokered by Terry Wong, head of funding markets and investment sales at Colliers Singapore, that represented the buyer GH15 Investments.

Refurbishment has settled for a comparable building. Mount Everest Properties offered GSM Building on Middle Road to Coliwoo for $80 million in 2023. After a significant repair, the structure, now called Coliwoo Midtown, is being gotten by CapitaLand Ascott Trust for $134 million under a deal announced in August.

Company files show that GH15 Ventures is an investment vehicle of GH15 Investments, a firm registered to operate hostels and dorms for college students, workers and others. Its director is Stephen Goh.

The customer can apply to URA for an improvement of use to a hotel or mixed-use development. If it opts for asset enhancement rather, Loi expects the structure to draw in offices and F&B companies displaced by the 2027 redevelopment of Marina Square and Valley Point. He likewise expects “solid support” from upcoming residential developments in Kallang and Boon Keng.

The general public tender closed on Oct 7 and enticed 3 bids, states Dillon Loi of Mount Everest Properties, the advertising representative. The succeeding bid is 4.8% above the $77 million requesting cost established when the building was relaunched to sell in September. It even covers the $80 million overview price for its first two attempts at a cumulative sale in October 2025 and March 2026. Both tenders closed without an effective bid.


error: Content is protected !!